Book a Demo

Production preparation

Production preparation, automated: routing, BOM and ERP data for every order

The moment an order is confirmed in the Oroox Manufacturing Commerce, Oroox generates the routing, assigns work centers and machines, calculates operation times and lead time, builds the manufacturing BOM, and sends it all to your ERP as a production order. No manual work preparation, no data re-typing.

✓ 99.99% accuracy across millions of parts quoted automatically and shipped as calculated.Bring a part and your ERP name. We’ll show you the routing and the export.
Confirmed order✓ Confirmed
bracket-bend.step
OrderSO-24-1187 · line 1
MaterialS235, 3 mmA36, 11 ga (0.120 in)
Quantity40 pcs
→in seconds
Routing · generatedPlanned the way it was priced
10Laser cuttingLASER-01setup 12 min · run 4.2 min
20DeburringDEBURRsetup 5 min · run 1.1 min
30Bending · 6 bendsBEND-02setup 20 min · run 3.5 min
40Powder coatingfinishing
Manufacturing BOM
Sheet 3 mm, S235Sheet 11 ga (0.120 in), A36raw material18.6 kg41 lb
PEM nut M6purchased2 per part
XML → ERPProduction order sent

Why work preparation slows down every order

The order is confirmed. Then it waits for work preparation.

Most job shops win the order and then start again from zero. Someone opens the CAD file, decides the operations, picks the machines, estimates the times, works out the material and types everything into the ERP. For a one-off part, that can take longer than making it.

Everything work preparation needs was already calculated for the quote. It just never reached the ERP.
1
Manual data entry, order after order.Routing, BOM and times typed into ERP screens by hand. Every typo is a wrong material or a wrong machine on the shop floor.
2
Work prep is the bottleneck.More orders and smaller batches mean more routings to write, with the same people.
3
The plan doesn’t match the price.Sales quoted with one set of operations and times. Production plans with another. Margins disappear in between.
4
Every planner does it differently.Two people, two routings for the same part. Lead times become guesses.
5
Lead time is promised before the plan exists.The customer gets a date before anyone knows which machines the part needs.

Manufacturing process planning, automated

Automated routing and process planning, from the same data that priced the part

To calculate a price, Oroox already works out how the part is made: which operations, in which order, on which machines, with which setup and run times. When the customer confirms the order, Oroox turns that calculation into a complete process plan, so the routing your ERP receives matches what you quoted.

CAD fileGeometry, cut length, bends, features, volume.
→
Quote calculationOperations, machines, setup and run times, price.
→
Confirmed orderThe same data is reused. Nothing is re-entered.
→
Process planRouting and BOM for your ERP, matching the price.
01

Automated routing generation

Every operation in sequence (cutting, bending, machining, welding, finishing, inspection) with its parameters. A digital routing sheet for each order line, no manual writing.
02

Work center and machine assignment

Each operation is assigned to the work center and machine that can actually do it, based on the capabilities, sizes and materials you set up in Oroox.
03

Setup and run times per operation

Setup time and run time for each operation, calculated from the part’s real geometry (cut length, bends, features, volume) and your machine parameters.
04

Production lead time calculation

Lead time calculated from the operations and your rules, so the date the customer sees is based on the actual routing.
A production-ready job for every order line, before anyone on your team opens the file.

Bill of materials generation

The manufacturing BOM (MBOM), generated with every order

Oroox builds the manufacturing bill of materials for each order line and passes it to your ERP together with the routing.

Automatic BOM generationRaw material (sheet, bar, tube, profile, powder) with grade and thickness, plus purchased components such as inserts, fasteners and hardware.
Material quantitiesQuantities per part and per order, based on the part’s geometry and the material use in your calculation, including nesting where it applies.
Assemblies and componentsFor assemblies, the structure of parts and components is carried over, so every sub-part gets its own routing and BOM line.
Order SO-24-1187 · line 1 · 40 pcsMBOM generated
Sheet, S235, 3.0 mmSheet, A36, 11 ga (0.120 in)raw material18.6 kg41 lb
PEM nut M6purchased component80 pcs
Powder, RAL 9005finishing material0.4 kg0.9 lb
Example data. Quantities include material use from the calculation.

CAD to ERP, without data re-entry

Manufacturing ERP integration: routing and BOM straight into your ERP

Oroox doesn’t replace your ERP. It feeds it. Every production order goes to the ERP as structured data, so your ERP can plan capacity, schedule, order material and run production as it does today.

XML export for any ERPOroox generates an XML file per order with the full work preparation data: operations, routing steps, work centers and resources, setup and run times, materials and production parameters. Most ERPs can import it through their standard interface.
From CAD file to ERPThe chain from CAD upload to ERP production order is unbroken: the geometry that priced the part also defines the routing and the BOM. That’s CAD ERP integration without a CAD plugin.
API and webhooksFor deeper integration, the same data is available through the Oroox REST API and webhooks.
Statuses back from the ERPWhen your ERP reports progress, the order status in Oroox and in the customer portal updates too.
SO-24-1187-1.xmlExample structure
<ProductionOrder order="SO-24-1187" line="1" qty="40">
<Material grade="S235" thickness="3.0" unit="kg" qty="18.6"/>
<Operation seq="10" workCenter="LASER-01" setup="12" run="4.2"/>
<Operation seq="20" workCenter="DEBURR" setup="5" run="1.1"/>
<Operation seq="30" workCenter="BEND-02" setup="20" run="3.5"/>
</ProductionOrder>

Order-to-production workflow

Manufacturing workflow automation, from confirmed order to ERP

Order SO-24-1187✓ Confirmed
Line 1bracket-bend.step
Confirmed byCustomer, in your shop
Material · quantityS235, 3 mm · 40 pcsA36, 11 ga (0.120 in) · 40 pcs
From “order confirmed” to “production order in the ERP” in seconds, not days.

Built for high-mix, make-to-order manufacturing

Built for make-to-order and high-mix, low-volume manufacturing

Repeat products get their routing written once. Job shops and contract manufacturers get a new part with every order. That’s where manual work prep breaks down, and where automated routing pays off.

Job shops and contract manufacturers

with hundreds of different parts a week.

Make-to-order and engineer-to-order manufacturers

that quote and build from the customer’s CAD file.

Multi-site manufacturers

where each plant has its own machines. Routing uses the work centers of the plant that gets the order.

Processes

sheet metal, CNC machining, tube and profile cutting, 3D printing.

What changes for your team

Manual work preparation vs automated production preparation

Before
With Oroox
✕Routing written by hand for every order
✓Routing generated when the order is confirmed
✕Machines and times chosen by whoever plans the job
✓Work centers and times based on the same rules, every time
✕BOM built from the drawing
✓Manufacturing BOM generated with the routing
✕Data typed into ERP fields
✓XML / API export into the ERP
✕Mismatched quote and production plan
✓Planned the way it was priced
✕Lead time promised before the plan exists
✓Lead time based on the routing

Why it pays off

Faster to production, fewer errors, margins that hold

99.99%
of ordered parts are produced and shipped exactly as calculated.
✓
Orders reach production faster.No queue in work preparation for standard parts.
✓
No manual data entry errors.No wrong material, no forgotten operation, no typo in the quantity.
✓
Your engineers work on the hard parts.Work prep reviews the exceptions instead of writing every routing.
✓
Margins hold.Production runs on the same operations and times that set the price. 99.99% of ordered parts are produced and shipped exactly as calculated.
✓
One digital thread from quote to production.The same manufacturing data from CAD upload to ERP, with no breaks and no copies.

Connected from quote to production

Production preparation, connected to quoting, orders and your ERP

Instant Quoting

Calculates operations, times and price from the CAD file.

Order Management

Validates and routes every confirmed order.

Rule Engine

Your machines, materials, rates and lead-time rules.

Multi-Plant

Several plants, each with its own machines.

Integrations

ERP, MRP, CRM, accounting and CAD/CAM.

FAQ

Frequently asked questions

What is routing in manufacturing?+
A routing (also called a process plan, routing sheet, or traveler) is the list of operations needed to make a part, in order, with the work center, setup time and run time for each step. The ERP uses it to schedule production and calculate costs. Oroox generates the routing automatically for every order line.
What is the difference between an engineering BOM and a manufacturing BOM?+
The engineering BOM (EBOM) lists the parts as designed. The manufacturing BOM (MBOM) lists what production needs to make them: raw material with grade and size, quantities including material use, and purchased components. Oroox generates the MBOM from the order and the calculation.
Does Oroox replace my ERP or MRP?+
No. Oroox prepares the production data. Your ERP keeps scheduling, capacity planning, material requirements planning, purchasing and shop-floor tracking. Oroox removes the manual step of creating routings and BOMs and typing them into the ERP.
Which ERP systems can Oroox send data to?+
Any ERP that can import XML or work with a REST API. Oroox integrations →
How is the production lead time calculated?+
The production lead time is calculated from the operations in the routing and the lead-time rules you set (for example by process, material or quantity). The customer sees the delivery date based on the actual work plan.
Can my team change the generated routing?+
Yes. Your team can review and adjust any routing before it goes to the ERP. Most standard parts go through without changes.
How is this different from PLM-ERP or CAD-to-ERP tools?+
PLM and CAD-to-ERP tools move the designer’s engineering BOM into the ERP. Oroox creates what the shop floor needs, the routing, work centers, times and manufacturing BOM, from the customer’s CAD file and your own manufacturing rules.
Still have questions?Can’t find the answer you’re looking for? Send a message to our team.
Get support

Stop re-typing orders into your ERP

Send us a part and tell us which ERP you run. We’ll show you the routing, the BOM and the export Oroox generates for it. 20 minutes, no slides.

Book a demoTry it live
Calculate what manual work preparation costs you →